from Civil to Inventor

The Autodesk enthusiast exile

Civil 3D – Export Group for CSO

6/25/2009

This is just an organization idea, not a revelation.  I was tired of posting problems, and wanted to post something useful.

Problem with exchanging construction data

I used to rewrite all the data out to the crews, and give them a new file.  I had to bring in the old file each time, recover all the check data for review, as well as any new control.  A genuine PITA.  I did not mind so much, but once in a while the crews would level through horizontal control, and revised elevations.  I’d miss those.  The next day was quite frustrating if they did not notice my mistake.

I decided to stop the madness by exporting only new data, and merging the data into their files.  They have 2 free ranges; 1 for control, and 1 for recollect checks.  I have 1 free range for calcs.  This way I can merge the points without worry of overwrite.  When I need the recollects, I pickup new control at the same time, so those control points show up on the calc plots.

Export Group

Each time I export the NEW data, I assign the NEW point to an export group, from which I export out of.  The trick is to use this as an organizational tool.  I have assigned sort point and label styles, and the group lies below the All Points group.

Continue reading

June 25, 2009 Posted by | 2009, 2010, Points | , , , , , , , | Leave a comment